scoring
Estimated time to a working minimum viable product: under one month, one to three, three to six, or six-plus months.
Time to MVP is a coarse estimator on every paper that signals how much engineering effort stands between the published result and a shippable product. The four bands let a founder triage a long reading list into a buildable shortlist in minutes.
Source: curated glossary catalog. Freshness: git_versioned_curated_catalog.
Term API · apps/web/data/glossary/terms.ts