{"data":{"slug":"time-to-mvp","term":"Time to MVP","bucket":"scoring","definition":"Estimated time to a working minimum viable product: under one month, one to three, three to six, or six-plus months.","short_definition":"Estimated time to a working minimum viable product: under one month, one to three, three to six, or six-plus months.","long_definition":"Time to MVP is a coarse estimator on every paper that signals how much engineering effort stands between the published result and a shippable product. The four bands let a founder triage a long reading list into a buildable shortlist in minutes.","related_terms":["paper-pack","buildability-receipt"],"related_term_routes":[{"slug":"paper-pack","term":"Paper Pack","route":"/resources/glossary/paper-pack"},{"slug":"buildability-receipt","term":"Buildability Receipt","route":"/resources/glossary/buildability-receipt"}],"canonical_route":"/resources/glossary/time-to-mvp","api_route":"/api/v1/resources/glossary/time-to-mvp","jsonld_id":"https://sciencetostartup.com/resources/glossary/time-to-mvp","variants":[],"tldr":"Estimated time to a working minimum viable product: under one month, one to three, three to six, or six-plus months.","key_points":[],"quality_tier":null,"citation_count":null,"source_state":"curated_static","source_module":"apps/web/data/glossary/terms.ts","definition_sections":{"schema_version":1,"intro":"Time to MVP is a coarse estimator on every paper that signals how much engineering effort stands between the published result and a shippable product. The four bands let a founder triage a long reading list into a buildable shortlist in minutes.","sections":[{"title":"Definition","items":[{"subtitle":"Time to MVP","text":"Time to MVP is a coarse estimator on every paper that signals how much engineering effort stands between the published result and a shippable product. The four bands let a founder triage a long reading list into a buildable shortlist in minutes."}]},{"title":"Related vocabulary","items":[{"subtitle":"Paper Pack","text":"The compact citation-grade envelope for one paper. Title, abstract, score, flags, one-liner, time-to-MVP. Sized for agent context (under 6144 bytes)."},{"subtitle":"Buildability Receipt","text":"The receipt for a paper's buildability. Carries status, checks, evidence set, holdout summary, scaffold contract, external gates."}]}],"cited_arxiv_ids":[]}},"meta":{"canonical_route":"/resources/glossary/time-to-mvp","api_route":"/api/v1/resources/glossary/time-to-mvp","source":{"label":"curated glossary catalog","source_state":"curated_static","source_module":"apps/web/data/glossary/terms.ts","method_version":"public_glossary_curated_terms_v2","freshness":{"status":"versioned","observed_at":null,"fresh_until":null,"reason":"Git-versioned curated catalog; daily ingestion freshness windows do not apply.","reason_code":"git_versioned_curated_catalog"},"source_count":111,"bucket_count":7,"buckets":["scoring","surfaces","agents","distribution","data","foresight","buildability"]}}}