{"data":{"slug":"buildability-wave","term":"Buildability Wave","bucket":"buildability","definition":"Progressive buildability assessment phases, wave_0 through wave_7. Each wave adds evidence requirements and external gates.","short_definition":"Progressive buildability assessment phases, wave_0 through wave_7. Each wave adds evidence requirements and external gates.","long_definition":"Buildability Waves stage the proof: wave_0 is metadata only; wave_7 requires founder signatures, live telemetry, external adoption, real-judge divergence, and the public Brier receipt. Each step up tightens the contract a Buildability Receipt has to satisfy before the platform calls a paper buildable.","related_terms":["buildability-receipt","brier-score"],"related_term_routes":[{"slug":"buildability-receipt","term":"Buildability Receipt","route":"/resources/glossary/buildability-receipt"},{"slug":"brier-score","term":"Brier Score","route":"/resources/glossary/brier-score"}],"canonical_route":"/resources/glossary/buildability-wave","api_route":"/api/v1/resources/glossary/buildability-wave","jsonld_id":"https://sciencetostartup.com/resources/glossary/buildability-wave","variants":[],"tldr":"Progressive buildability assessment phases, wave_0 through wave_7. Each wave adds evidence requirements and external gates.","key_points":[],"quality_tier":null,"citation_count":null,"source_state":"curated_static","source_module":"apps/web/data/glossary/terms.ts","definition_sections":{"schema_version":1,"intro":"Buildability Waves stage the proof: wave_0 is metadata only; wave_7 requires founder signatures, live telemetry, external adoption, real-judge divergence, and the public Brier receipt. Each step up tightens the contract a Buildability Receipt has to satisfy before the platform calls a paper buildable.","sections":[{"title":"Definition","items":[{"subtitle":"Buildability Wave","text":"Buildability Waves stage the proof: wave_0 is metadata only; wave_7 requires founder signatures, live telemetry, external adoption, real-judge divergence, and the public Brier receipt. Each step up tightens the contract a Buildability Receipt has to satisfy before the platform calls a paper buildable."}]},{"title":"Related vocabulary","items":[{"subtitle":"Buildability Receipt","text":"The receipt for a paper's buildability. Carries status, checks, evidence set, holdout summary, scaffold contract, external gates."},{"subtitle":"Brier Score","text":"A proper scoring rule for probabilistic predictions. Lower is better. Public Brier receipt is a pending gate for Wave 7."}]}],"cited_arxiv_ids":[]}},"meta":{"canonical_route":"/resources/glossary/buildability-wave","api_route":"/api/v1/resources/glossary/buildability-wave","source":{"label":"curated glossary catalog","source_state":"curated_static","source_module":"apps/web/data/glossary/terms.ts","method_version":"public_glossary_curated_terms_v2","freshness":{"status":"versioned","observed_at":null,"fresh_until":null,"reason":"Git-versioned curated catalog; daily ingestion freshness windows do not apply.","reason_code":"git_versioned_curated_catalog"},"source_count":111,"bucket_count":7,"buckets":["scoring","surfaces","agents","distribution","data","foresight","buildability"]}}}